Past PB Cycle Results

2024 PB Winner (Budget priorities based upon 2023 vote)

Please note that this is not an exhaustive list of all projects in development, or which will be authorized this budget cycle. This is a list of projects authorized to date. 

Alley Apron 3040 W Belden Ave Authorized
Alley Resurfacing N St Louis Ave & W Schubert Ave & W Parker Ave & N Kimball Ave Authorized
Alley Speed Hump N Sacramento Ave & W Waveland Ave & W Addison St & N Richmond St Authorized
Alley Speed Hump W Altgeld At & N Kedzie Blvd & N Sawyer Ave & W Wrightwood Ave Authorized
Alley Speed Hump N St Louis Ave & W Schubert Ave & W Parker Ave & N Kimball Ave Authorized
Alley Speed Hump Replacement N St Louis Ave & W Schubert Ave & W Parker Ave & N Kimball Ave Authorized
Arterial Street Bump Outs On N Kimball Ave From W Drummond Pl (2630 N) to W Schubert Ave (2700 N) Authorized
Arterial Street Bump Outs N Central Park Ave & W Lyndale St Authorized
Bike Lane/Marked Shared Lane On W Wellington Ave from N Sacremento Ave (3000 W) to N Kedzie Ave (3200 W) Authorized
Bike Lane/Marked Shared Lane On N Hamlin Ave from 1808 N to W Diversey Ave (2800 N); on N Avers Ave from W Armitage Ave (2000 N) to W Diversey Ave (2800 N) Authorized
Curb & Gutter 3057 W Grace St Authorized
Curb & Gutter N Woodward St & N Christiana Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign N Kimball Ave & W Drummond Pl Authorized
In-Road "State Law Stop For Pedestrians" Sign W Diversey Ave & N Spaulding Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign W Armitage Ave & N Tripp Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign W Diversey Ave & N Springfield Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign W Diversey Ave & N St Louis Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign N Milwaukee Ave & N Winser Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign N Kedvale Ave & W Armitage Ave Authorized
In-Road "State Law Stop For Pedestrians" Sign N Sacramento Ave & W George St Authorized
Miscellaneous CDOT Projects 2358 N Keystone Ave Authorized
Pavement Markings W Diversey Ave & N Sawyer Ave Authorized
Pavement Markings N Elston Ave & N Bernard St; W Grace St & N Elston Ave Authorized
Pavement Markings N Kimball Ave & W Newport Ave; On N Kimbaall Ave from N Avondale Ave (3400 N) to W Addison St (3600 N) Authorized
Sidewalk 2100 N Tripp Ave Authorized
Sidewalk 3048 N Sawyer Ave Authorized
Sidewalk 2911 N Ridgeway Ave Authorized
Sidewalk 3052-3054 N Monticello Ave Authorized
Sidewalk On N Kimball Ave from N Wisner Ave (3600 N) to W Wellington Ave (3000 N) Authorized
Sidewalk 2108-2110 N Kildare Ave Authorized
Sidewalk 3106 N Monticello Ave; 3125 N Monticello Ave Authorized
Sidewalk 3017 N California Ave Authorized
Sidewalk 2211 N Keeler Ave Authorized
Sidewalk 3908 N Kimball Ave Authorized
Sidewalk On W Wolfram St from N Drake Ave (3560 W) to N Central Park Ave (3600 W) Authorized
Sidewalk 3108-3110 N St Louis Ave Authorized
Sidewalk 2905-2909 N Dawson Ave Authorized
Sidewalk 3081 N Elbridge Ave; 3076-3080 N Elbridge Ave Authorized
Sidewalk 2952 N Gresham Ave Authorized
Sidewalk 2304-2312 N Central Park Ave Authorized
Sidewalk 2847-2851 N Francisco Ave Authorized
Sidewalk 2738 N Lawndale Ave Authorized
Sidewalk 2314 N Monticello Ave Authorized
Sidewalk 3123-3129 N Richmond St Authorized
Sidewalk 3650 N Francisco Ave Authorized
Sidewalk 2643 N Troy Ave Authorized
Sidewalk 3442-3524 W Belmont Ave Authorized
Sidewalk 2417-2419 N Springfield Ave Authorized
Street Bump Outs W Shakespeare Ave & N Drake Ave Authorized
Street Bump Outs N Sacremento Ave & W George St Authorized
Street Resurfacing On N albany Ave from W Fullerton Ave (2400 N) to N Kedzie Blvd E (2500 N) Authorized
Street Resurfacing On W George St from N Kedzie Ave (3200 W) to N Christiana Ave (3330 W) Authorized
Street Speed Hump On W Shakespeare Ave from N Lawndale Ave (3700 W) to N Hamlin Ave (3800 W) Authorized
Street Speed Hump On N Tripp Ave from W Dickens Ave (2100 N) to W Palmer (2200 N) Authorized
Street Traffic Circle N St Louis Ave & W Belden Ave Authorized
Street Traffic Circle W Waveland Ave & N Bernard St Authorized
Street Traffic Circle W Waveland Ave & N St Louis Ave Authorized
Street Light Upgrade 3916 N Elston Ave Authorized
Street Light Upgrade 3656 N Richmond St Authorized
Street Light Upgrade 3116 N Rockwell Ave Authorized
Street Light Upgrade 3320 W Fullerton Authorized
Sidewalk 2137 N Lawndale Ave Authorized
ADA- Alley Resurfacing N St Louis Ave & W Schubert Ave & W Parker Ave & N Kimball Ave Authorized- OF
MFT- Street Speed Hump Removal On N Tripp Ave from W Dickens Ave (2100 N) to W Palmer (2200 N) Authorized- OF
GO Bonds- Concrete Alley W Addison St & N Drake Ave & N St Louis & W Waveland Ave Authorized- OF
GO Bonds- Street Light Residential Staggered Piggy Back On W Barry Ave from N Kimball Ave (3400 W) to N Bernard St (3430 W); On N Gresham Ave from N Milwaukee Ave (2930 N) to W Barry Ave (3100 N) Authorized- OF

2023 PB Winners 

Project Type Address Status
Alley Apron 2238 N. Spaulding Ave.  
Alley Apron 2468 N. Albany Ave.  
Alley Apron 2849 W. Barry Ave. In Progress
Alley Resurfacing W. Belden Ave & N. Springfield Ave. & N. Pulaski Rd. & W. Palmer St. Completed
Alley Resurfacing W. Medill Ave & N. Drake Ave. & N. Central Park Ave. $ W. Fullerton Ave. Completed
Alley Resurfacing N. Lawndale Ave & W. Altgeld St. & W. Fullerton Ave & N. Ridgeway Ave. Completed
Alley Resurfacing W. Diversey Ave. & N. Lawndale Ave & N. Ridgeway Ave. & W. Schubert Ave. Completed
Alley Resurfacing W Altgeld St. & N. Harding Ave & N. Pulaski Rd. & W. Wrightwood Ave Completed
Alley Resurfacing W. Waveland Ave & N. Drake Ave & N, St. Louis & W. Grace St. Completed
Alley Resurfacing W. Belmont Ave. & N. Kimball Ave & N. Bernard St. & W. Barry Ave Completed
Bike Lane/Marked Shared Lane On N. Central Park Ave From W. Diversey Ave (2800 N) to W. Belmont Ave (3200 N) Scheduled for implementation summer 2024
Bike Lane/Marked Shared Lane On N. California Ave From W. Diversey Ave (2800 N) to W. Belmont Ave (3200 N) Scheduled for implementation summer 2024
Bike Lane/Marked Shared Lane On Wellington Ave From N. Kedzie Ave (3200 W) to N Kimball Ave (3400 W) Completed
GO BONDS- Concrete Alley N Sawyer Ave & W George St & W Diversey Ave & N Spaulding Ave Scheduled for implementation summer 2024
GO BONDS- Street Light Residential Staggered Piggy Back On N Keeler Ave From W Dickens Ave (2100 N) to W Palmer St (2200 N) Completed
Miscellaneous Other Projects 2912 N California Ave In process with DCASE
Pedestrian Refugee Island W Fullerton Ave & N St Louis Ave Scheduled for implementation summer 2024
Sidewalk On N Drake Ave From 2115 N to W Dickens Ave (2100 N) Completed
Sidewalk On Springfield Ave From W Wrightwood Ave (2600 N) to W Schubert Ave (2700 N) Scheduled for implementation summer 2024
Sidewalk On N Kimball Ave From W Belden Ave (2300 N) to W Medill Ave (2330 N) Completed
Sidewalk On N Keeler Ave From W Dickens Ave (2100 N) to W Palmer St (2200 N) Completed
Sidewalk 3309 W Wellington Ave Completed
Sidewalk 3458 N Kimball Ave Completed
Sidewalk 3926 W Belden Ave Scheduled for implementation summer 2024
Sidewalk 3449 W School St; On W School St from 3540 W to W Melrose St (3410 W) Completed
Sidewalk On N Springfield Ave From W Belden Ave (2300 N) to W Fullerton Ave (2400 N) Completed
Sidewalk 3701 W Fullerton Ave Completed
Sidewalk On N Drake Ave From W Palmer St (2200 N) to W Lyndale St (2230 N) Completed
Sidewalk 2606 N Kimball Ave Completed
Speed Indicator Signs 3103-3106 N Kedzie Ave; W Barry Ave & N Kedzie Ave Completed
Street Bump Outs On N Kimball Ave From W Drummond Pl (2630 N) to W Schubert Ave (2700 N) Scheduled for implementation 
Street Light Pole For High Definition Camara N Hamlin Ave & W Belden Ave Completed
Street Resurfacing On N Spaulding Ave From W Belmont Ave (3200 N) to W Barry Ave (3100 N) Completed
Street Resurfacing On W Fletcher St From N Washtenaw Ave (2700 W) to N Elston Ave (2740 W) Completed
Street Resurfacing On W Altgeld St From N Harding Ave (3930 W) to N Pulaski Rd (4000 W) Completed
Street Resurfacing On N Albany Ave From W Fullerton Ave (2400 N) to N Kedzie Blvd E (2500 N) Completed
Street Speed Hump On W Barry Ave From N Kimball Ave (3400 W) to N St Louis Ave (3500 W) Completed
Street Speed Hump On W Barry Ave From N St Louis Ave (3500 W) to N Central Park Ave (3600 W) Completed
Street Speed Hump On W Palmer St From N Pulaski Rd (4000 W) to N Kostner Ave (4400 W) Completed
Street Resurfacing On N Albany Ave From W Fullerton Ave (2400 N) to N Kedzie Blvd E (2500 N) Completed
Street Speed Hump On W Shakespeare Ave From N Lawndale Ave (3700 W) to N Hamlin Ave (3800 W); 3700 W Shakespeare Ave Scheduled for implementation summer 2024
Street Speed Hump On N Tripp Ave from Dickens Ave (2100 N) to W Palmer St (2200 N) Scheduled for implementation summer 2024
Street Traffic Circle N St Louis Ave & W Belden Ave Scheduled for implementation 
Street Light Upgrade 3916 N Elston Ave Completed
Street Light Upgrade 3656 N Richmond St Completed

PB 2022 Winning Projects

Thank you to all of our residents who voted in our 2022 PB cycle! Voting for PB 2022 occurred online and at the ward office between Friday, December 17, 2021, and, January 17, 2022. A total of 805 votes were cast. Please see the winning projects below.

Street Resurfacing ($400,000)

Complete resurfacing of deteriorated streets in the 35th Ward as determined by the Alderman’s office in conjunction with the PB Committee and with expert information from the Chicago Department of Transportation (CDOT). Streets selected were submitted at idea collection events, through 3-1-1 requests, and called into the 35th Ward office for repairs. 

  • Central Park Ave from Grace St to Elston Ave (COMPLETED)
  • Central Park Ave from Berteau Ave to Cullom Ave (COMPLETED)
  • Berteau Ave from MonticelloAve to Lawndale Ave (COMPLETED)
  • Belden Ave from Keeler Aver to Kildare Ave (COMPLETED)
  • Harding Ave from Belden Ave to Fullerton Ave (COMPLETED)
  • Hamlin Ave from Sunnyside Ave to Wilson Ave (COMPLETED)
  • Palmer St from Karlov Ave to Kedvale Ave (COMPLETED)
  • Henderson St from Central Park Ave to Drake Ave (COMPLETED)

Sidewalk Repairs ($300,000)

Concrete restoration of damaged and cracked sidewalks.

  • Hamlin from Shakespeare to Palmer - East Side (FUNDED)
  • Drake from Belden to Lyndale - West Side (FUNDED)
  • Wrightwood from Spaulding to Kimball - South Side (FUNDED)
  • Hamlin from Giddings to Lawrence - East Side (FUNDED)
  • Cullom from Hamlin to Ridgeway - North Side (FUNDED)

Pedestrian & Cyclist Safety ($375,000)

Residential staggered piggyback lights

  • Bernard from Montrose to Sunnyside (FUNDED)
  • Lawndale from Leland to Lawrence (COMPLETED)

Bike Lane/Marked Shared Lane

  • Central Park from Fullerton to Dickens (COMPLETED)
  • Montrose from Pulaski to Kimball (FUNDED)
  • Cortland from Kostner to Pulaski - CDOT rejected the project because it did not connect to an existing bike network.

Bump Outs Near Schools and Parks

  • On Kedzie Ave at George St and Wellington Ave (SURVEY REQUESTED)
  • On Palmer St at Keeler Ave and Kedvale Ave (FUNDED)

Nixon Elementary Playground Enhancements (FUNDED)

  • Basketball court 
  • Asphalt soccer field
  • Asphalt tracks
  • Four square & hopscotch
  • Additional gated entry and exit 
  • 360 OEMC camera in front of the playground

Alleys

Asphalt restoration of damaged alleys. 

  • Central Park Ave bounded by Berteau Ave, BellePlaine Ave, and Drake Ave (COMPLETED)
  • Ridgeway Ave bounded by Belden Ave, Fullerton Ave, and Lawndale Ave (COMPLETED)
  • Fullerton Ave bounded by St. Louis Ave, Drake Ave, and Medil Ave (COMPLETED)

2021 PB WINNING PROJECTS

Thank you to all of our residents who voted in our 2021 PB cycle! Voting took place from January 11, 2020 - February 12, 2021. Votes were collected mainly online to adhere to social distancing measures and to limit in-person interactions. Over 500 residents voted in our 2021 cycle! Please see the winning projects below.

Alleys ($200,000)

Complete resurfacing of deteriorated alleys in the 35th Ward as determined by the Alderman’s office in conjunction with the PB Committee and with expert information from the Chicago Department of Transportation (CDOT). Alleys selected were submitted at idea collection events, through 3-1-1 requests, and called into the 35th Ward office for repairs. 

Alley bounded by N. Drake & W Berteau, N. Central Park, & W. Cullom (COMPLETED)
Alley bounded by N. Gresham & N. Milwaukee & N. Elbridge & N. Barry (COMPLETED)
Alley bounded by N. Central Park & W. Ainslie & N. Monticello & W. Lawrence (COMPLETED)
Alley bounded by W. Bloomingdale & N. Kildare & W. Cortland (COMPLETED)
Alley bounded by N. Pulaski & W. Sunnyside & W. Wilson & N. Harding (COMPLETED)
Alley bounded by N. Kedvale & W. Cortland & W. Armitage & N. Keeler (COMPLETED)

Sidewalks ($300,000)

Concrete restoration of damaged and cracked sidewalks.

Cortland from Kostner to Lowell - North Side (COMPLETED)
Cortland from Kildare to Tripp - North Side (COMPLETED)
Cortland from Tripp to Keeler - North Side (COMPLETED)
Cortland from Tripp to Keeler - South Side (COMPLETED)
Cortland from Pulaski to Keystone - North Side (COMPLETED)
Cortland from Lowell to Kildare - North Side (COMPLETED)
Cortland from Kildare to Tripp - South Side (COMPLETED)
Leland from Springfield W to Alley - South Side (COMPLETED)
Cullom from Bernard to Kimball - Soth Side (COMPLETED)
Waveland from Christiana to Kimball - North Side (COMPLETED)
Berteau from Bernard to St. Louis - Southside (COMPLETED)

Street Resurfacing ($300,000)

Complete resurfacing of streets determined by the Alderman’s office with information submitted by residents at Idea Collection events, assessment by the PB Committee, resident submitted info via 311, and expert information from the Chicago Department of Transportation (CDOT).

On St. Louis from W. Altgeld to W. Wrightwood (COMPLETED)
On N. Springfield from W. Belden to W. Fullerton (COMPLETED)
On W. Belden from N. Springfield to N. Pulaski (COMPLETED)
On N. Kedvale from W. Cortland to W. Armitage (COMPLETED) 
On N. Spaulding from W. Belmont to W. Barry (COMPLETED) 
On N. Avers from N. Sunnyside to W. Wilson (COMPLETED) 

Repairs Near Schools ($200,000)

Helge A. Haugan Elementary (4540 N Hamlin) fence repair (COMPLETED)

Residential staggered piggyback lights

On N. Sawyer from W. Wellington to W. George (COMPLETED)
On W. Wellington from N. Kedzie to N. Sawyer (COMPLETED) 

 


2020 PB WINNING PROJECTS 

Thank you to all of our residents who voted in our 2020 Participatory Budgeting (PB) cycle! Over 600 votes were cast online and in person at our ward office and off-site location sites from October 15th - October 29th. The projects below received the most votes. 

 

 ALLEY RESURFACING  (Total Cost $700,000) 

Complete resurfacing of deteriorated alleys in the 35th Ward as determined by the Alderman’s office in conjunction with the PB Committee and with expert information from the Chicago Department of Transportation (CDOT). Alleys selected were submitted at idea collection events, through 3-1-1 requests, and called into the 35th Ward office for repairs. 

  • Alley bounded by N. Dawson Ave & N. Milwaukee Ave & N. Kimball Ave & N. Wisner Ave (COMPLETED)
  • Alley bounded by W. Wolfram St. & N. Drake Ave. & N. Central Park & N. Milwaukee Ave (COMPLETED)
  • Alley bounded by W. Belden Ave. & N. Monticello Ave & N. Lawndale & W. Fullerton Ave (COMPLETED)
  • Alley bounded by N. Kildare Ave & W. Palmer St & W. Shakespeare Ave & N. Kostner Ave (COMPLETED)
  • Alley bounded by N. Keeler Ave & W. Fullerton Ave & W. Belden Ave & N. Kedvale Ave (COMPLETED)
  • Alley bounded by N. Karlov Ave & W. Armitage Ave & N. Kedvale Ave & W. Cortland Ave (COMPLETED)
  • Alley bounded by N. St. Louis Ave & W. Montrose Ave & Cullom Ave & N. Bernard Street (COMPLETED)
  • Alley bounded by N. Lawndale Ave & N. Hamlin Ave & W Agatite & W. Sunnyside (COMPLETED)
  • Alley bounded by N. Spaulding Ave & West Fullerton & N Sawyer (COMPLETED)
  • Alley bounded by N. Kildare & W. Palmer & W. Shakespeare (COMPLETED)
  • Alley bounded by N. Central Park Ave & W. Sunnyside Ave & W. Montrose & N. Drake (FUNDED, in the queue for implementation)
  • Alley bounded by N. Keeler Ave & W. Cortland st & Armitage Ave & N Tripp Ave (COMPLETED)
  • Alley bounded by W. Diversey Ave & N Lawndale Ave & N Monticello Avenue & W Schubert Ave (COMPLETED)

 SIDEWALK REPAIRS (Total Cost $300,000)

Concrete restoration of damaged and cracked sidewalks.

  • Barry Between Sawyer - North Side Sidewalk (COMPLETED)
  • 3300 block of N. Drake, West Side - West Sidewalk (COMPLETED)
  • 2300 block of N. Hamlin, East Side - East Sidewalk (COMPLETED)
  • 3300 block of W. Altgeld, North Side - North Sidewalk (COMPLETED)
  • 3830 W. Leland Ave from N. Avers to N. Springfield Ave - North Sidewalk (COMPLETED)
  • 3930 W. Leland Ave from N. Harding Ave to N. Pulaski Rd - South Sidewalk (COMPLETED)

 DISCRETIONARY SPENDING ($300,000)

In addition to projects that were selected through our ballot, Alderman Rosa has funded additional projects with discretionary funds to improve the quality of life for 35th Ward residents and ensure equity for public infrastructure spending across all five of our 35th Ward neighborhoods. 

Street Resurfacing:

  • On N. Bernard St from W. Montrose Ave to W. Sunnyside Ave (COMPLETED)
  • On N. Spaulding Ave from N. Milwaukee Ave to W. Diversey Ave (COMPLETED)
  • On W. Belden Ave from N. Lawndale to N. Monticello Ave (COMPLETED)
  • On N. Sunnyside Ave from St. Louis Ave to N. Central Park (COMPLETED)
  • On N. St. Louis from W Belden Ave to W Fullerton Ave (COMPLETED)
  • On N. Drake Ave from W Dickens Ave to W. Palmer St (COMPLETED)
  • On Karlov Ave from W Dickens Ave to W Palmer St (COMPLETED)
  • On Drake Ave from Henderson St to School St (COMPLETED)
  • On Harding from Sunnyside Ave from Sunnyside Ave to W. Wilson Ave (COMPLETED)

 


2019 PB WINNING PROJECTS 

PB 2019 voting occurred online, at the ward office, and at various off-site locations throughout the ward between Monday, November 5 and Friday, November 16, 2018. A total of 728 votes were cast. The following projects received the most votes:

STREET RESURFACING (Total Cost: $700,000)* 

Complete resurfacing of streets determined by the Alderman’s office with information submitted by residents at Idea Collection events, assessment by the PB Committee, resident submitted info via 311 and expert information from the Chicago Department of Transportation (CDOT).

  • Karlov from 1800 to Cortland (COMPLETED)
  • Spaulding from 3517 to Addison (COMPLETED)
  • Spaulding from Wrightwood to Schubert (COMPLETED)
  • Altgeld from St. Louis to Drake (COMPLETED)
  • Eastwood from Hamlin to Lawndale/dead-end street (COMPLETED)
  • Agitate from Lawndale to Monticello/alley (COMPLETED)
  • Cullom from St. Louis to Kimball (COMPLETED)
  • 4800 N. Hamlin from Lawrence to Ainslie (COMPLETED)

BEAUTIFICATION (Total Cost: $30,000)*

Planters and additional trash cans on arterial streets in Hermosa and Irving Park

  • Planters (3) along Irving Park between Drake and Central Park  (COMPLETED)
  • Planters (4) along Fullerton between Keystone and Keeler (COMPLETED)
  • Steel trash can on Fullerton and Keystone (COMPLETED)
  • Steel trash can on the southeast corner of Fullerton and Karlov (COMPLETED)
  • Steel trash can on the southeast corner of Fullerton and Kedvale (COMPLETED)

LIGHTING (Total Cost: $100,000)*

Residential LED lighting with piggybacks.

  • 4000 W. Belden (COMPLETED)

*Prices reflect base estimates from CDOT, actual costs of projects may vary depending on scope work, as well as the materials, tools, and crews needed to complete a project. 

 


2018 PB WINNING PROJECTS 

ALLEY RESURFACING (Total Cost: $526,500) - 253 Votes
Complete resurfacing of alleys, eliminate standing water, after snow turns into large ice patches, grading to sewer instead of residents basements, yards, garages and other destruction of property.

  • Albany Park locations: Alley between Central Park Ave and Monticello (between Montrose and Sunnyside, behind 4454 N Central Park Ave and 4455 N Monticello), 4400 N. Central Park  
  • Avondale locations: 2867-2891 N Milwaukee Alley, 2915-3035 N Allen, 2812-2884 N Wisner, 2940-2942 Kimball
  • Hermosa locations: 2400 N St. Louis, 1900 block of Kildare, 1900 block ofLowell, 2211 N Kildare to 4305 W Belden, 2222 W Kildare to 4305 W Belden (utility resurfaced about 1/3, so 2/3 needs to be done previous work from people’s gas), 2044 N Kedvale 
  • Irving Park locations: 4100 block between Lawndale and Ridgeway, 4130 N Kimball block

STREET RESURFACING (Total Cost: $217,500) - 335 Votes

Complete resurfacing of streets, eliminate standing water, after snow turns into large ice patches, grading to the sewer.

  • Albany Park locations: 4600 N Monticello, 4700 N Monticello
  • Hermosa location: 2200 N Lowell, 2200 N. Tripp
  • Irving Park location: 4300 N Lawndale
  • Logan Square location: 2700 N Lawndale

SIDEWALK REPAIRS (Total Cost: $300,000) - 270 Votes
Complete replacement of sidewalk within the public right-of-way. 

  • Hermosa location: 2200 N Tripp Ave
  • Albany Park location: 4400 N. Avers 
  • Irving Park location: 3600 W Cullom
  • Logan Square location: 2400 N Central Park

 


2017 PB WINNING PROJECTS

BALLOT # AND TITLE

DESCRIPTION

VOTES

AMOUNT

#1

ALLEYS & CURBS

Resurface alleys:

  • 2200 N. Keeler/Tripp

  • 4100 N. Monticello/Lawndale

  • 4200 N. Ridgeway/Lawndale  

  • 4400 N. Central Park/Monticello

  • 4400 N. Kimball/Bernard

  • 3600 W. Montrose/Agatite  

  • 4400 N. Bernard/St. Louis

Replace concrete alley aprons:

  • W. Berteau at N. Monticello

  • W. Montrose at N. St. Louis

  • W. Bloomingdale at N. Tripp

  • W Sunnyside at N. St. Louis

Replace curbs & gutters:

  • Cortland at Keystone

  • along stretches of 2300 N. Keeler

391

$446,500

#2

PEDESTRIAN & 
TRAFFIC SAFETY

  • Neighborhood greenway on Wellington from Kedzie to Kimball

  • Pedestrian refuge island to cross Kimball at Wellington

  • Left-turn arrow installation at Milwaukee and Kimball

  • Pedestrian countdown for Fullerton at Central Park

305

$258,000

#4

HERMOSA LIGHTING PROJECTS

  • Karlov from Armitage to Fullerton

  • Tripp from Palmer to Belden

264

$390,000

 


2016 PB WINNING PROJECTS

Total no. of ballots cast: 649

Ballot Project No.

Title(s) & Description(s)

Total Votes

Amount

7 - Schools

  • Nixon School, Playground Site Prep
  • Murphy School, Soccer Turf and Goal Posts

508

$122,100

9 - Pedestrian Safety

  • N. Elston, N. Christiana, & N. Waveland
  • Nixon School, Keeler Bumpouts
  • Logan Square Blue Line Wheelchair Ramp

446

$126,500

6 - Healthier and Greener Ward

  • Athletic Field Park Ballfields & Camera
  • Avondale Park Gymnastic Center
  • Unity Park Outdoor Repairs
  • Paseo Prairie Garden Water Access

378

$265,011

5 - Resurfacing

  • 2200 N. Lowell/Kedvale Alleys Aprons and Resurfacing
  • 4700 N. Harding repaving

143

$140,000

4 - Lighting

  • N. Hamlin from W. Sunnyside to W. Lawrence

103

$346,389 ($454,000)

RUNNER-UP PROJECTS

If the City of Chicago or sister agencies are unable to implement any of the above projects, the following runner-up projects will be submitted for implementation, by order of most votes:

Runner-up Ballot ProjectNo.

Runner-up Title(s) and Description(s)

Total Votes

Amount

8 - Transportation

  • Healy Metra Divvy Bikes & Beautification

80

$68,500

3 - Lighting

  • 2200 and 2300 N. Karlov

77

$161,000

1 - Lighting

  • 2900 N. Woodard

56

$117,000